Powered land · Verified megawatts · Placed demand

We buy the land,
prove the power, and build the data center.

DSpace is a data center site acquisition and development company. We control powered parcels across global markets, verify capacity against utility documentation, place offtakers, and deliver through EPC contractors and equipment partners.

Sites under coverage
46
Capacity tracked
9,340 MW
US · Canada · UK · Europe
Global

Greenfield campus · dedicated substation · transmission-adjacent

What we do

One team from parcel to energization — acquisition, power, offtake, construction and capital.

  1. 01

    Site acquisition

    Greenfield and brownfield parcels sourced against transmission, water, fiber and zoning — under control before the market sees them.

  2. 02

    Power verification

    Every megawatt is traced to a will-serve letter, capacity study, ISA or LGIA. Claimed capacity is never taken at face value.

  3. 03

    Offtake placement

    Hyperscale, AI and colocation demand matched to the sites that can actually energize on their timeline.

  4. 04

    EPC & equipment

    Contractor selection, long-lead gear and substation scope managed through to energization.

  5. 05

    Capital structuring

    JV equity, development capital and land basis structured around a defensible power position.

  6. 06

    Diligence discipline

    A standing powered-land checklist with evidence attached at every stage, not assembled at closing.

“A megawatt is only real when a utility says so.”

Most powered-land offerings are marketed on a number nobody has documented. A site advertised at 100MW frequently has 20MW of confirmed capacity behind it. We underwrite the gap before we spend a dollar — every megawatt tied to a will-serve letter, capacity study, ISA or LGIA, confirmed by a named source at the utility. That discipline is what lets us commit to offtakers on schedule and let capital partners underwrite with confidence.

The DSpace method

From parcel to first power, without losing the thread.

  1. 01

    Source

    Parcels screened against transmission, substation headroom, water, fiber and jurisdiction.

  2. 02

    Verify

    Utility documentation collected, evidenced and stress-tested against the claim.

  3. 03

    Place

    Offtake and capital matched to the site's real energization timeline.

  4. 04

    Deliver

    EPC, long-lead equipment and substation scope managed to first power.

Start a conversation

Have a site, a load, or capital?

We review powered land, offtake requirements and JV capital across all major markets. Discretion is standard.